การเพิ่มประสิทธิภาพผลผลิตของโรงงาน

Plant Throughput Optimisation KMK was requested by a major coal export terminal to review their existing wagon tippler system equipment for increasing the throughput capacity and system capability in line the new expansion. [...]

การจำลองรถไฟ

Train Simulation KMK was tasked by a major coal handling exporter to review their newly installed car Dumper system for equipment acceptance by evaluating the current throughput capacity against the client’s original specification. [...]

การตรวจสอบสถานที่จัดการวัสดุ

Material Handling Site Inspection KMK was selected to provide services for full inspection of stockyard machines such as Stacker Reclaimers, bridge reclaimers and ship-loaders. This task included a site visit with detailed machine [...]