Site Consulting and Optimisation

KMK inspected, analysed and optimised the operation of a major export terminal. Unfortunately, failures were interrupting the operation of the plant while further expansion of the facility was expected, and validation of new machines and processes was needed.

  • Finding Inaccuracies – in the operation cycles of the machines – introducing shock loads
  • Installation issues – led to motors opposing each other during operation
  • Inefficient bottlenecks – adding downtime during loading and unloading operations

Failures due to shock loading were stopping operation until the sourcing of long lead items was possible. After analysing the operating cycles KMK found the causes and fixed the shock loading issues for the future. Although this was a greenfield project, material throughput was being interrupted, and so with the addition of some buffer storage, KMK found vast improvements in throughput.

Improvements to the whole plant operation could increase export by 3 million tonnes per year.

KMK can provide clients with:

  • Insights from experience in many fields of Bulk Materials Handing
  • Flexibility to include the best option for each client
  • Site Optimisation and planning without bias

It is important to our customers, who say they are glad not to be burnt by an empty sales pitch that lets them down.

Benefits of site optimisation by KMK

  • Detailed experience of all plant processes
  • Production of Process and Site Designs
  • Unbiased analysis of plant equipment
  • Utilizing ROCKY DEM for material flow analysis
  • Full report and detailed recommendations for all affected equipment
  • Unbiased recommendations for new equipment
  • Links to equipment and engineering services across industry sectors and across the globe