Plant Throughput Optimisation

Plant Throughput Optimisation KMK was requested by a major coal export terminal to review their existing wagon tippler system equipment for increasing the throughput capacity and system capability in line the new expansion. This included a site visit for equipment inspection, train track topography review, hand calculations, new plant time-cycle and running train [...]

By |2020-08-07T11:41:37+01:00August 4th, 2020|Bulk Material Handling, Recent Work|0 Comments

Train Simulation

Train Simulation KMK was tasked by a major coal handling exporter to review their newly installed car Dumper system for equipment acceptance by evaluating the current throughput capacity against the client’s original specification. This task included a site visit for equipment inspection, system control software. (PLC/HMI/SCADA) review, power requirement calculations, new plant time-cycle and [...]

By |2020-10-02T22:52:17+01:00August 4th, 2020|Bulk Material Handling, Recent Work|0 Comments

Train Mover Design

Train Mover Design KMK was awarded a contract for designing an Indexer machine as part of a new Car Dumper system for 8000 tph (tonnes per hour) throughput. The Indexer machine was designed with the capacity of handling up to 152 wagons/cars (130 tonnes) with mid-train Loco (200 tonnes), capable of handling the train [...]

By |2020-10-08T16:34:19+01:00August 4th, 2020|Bulk Material Handling, Recent Work|0 Comments